• <thead id="nf6nq"><rp id="nf6nq"><tr id="nf6nq"></tr></rp></thead>

    <sub id="nf6nq"><s id="nf6nq"></s></sub>

    
    
    <sub id="nf6nq"></sub>
    日韩午夜,国语高潮无遮挡无码免费看,亚洲激情AV,被灌满精子的波多野结衣,国产视频拍拍拍,人妻中出无码一区二区三区 ,久久久久久av,亚洲精品97久久一 上海金泰工程機械有限公司
    上海安亭洛浦路45號 400-820-8326

    NEWS

    BZ70 Hydraulic walking pile frame

    2010-03-20

    BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


    ?

    1.Stable machine system
    Mast, main platform and walking framework are specially designed for heavy pile foundation.
    39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
    It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
    The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
    The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
    Lifting-up cylinder stroke is 900mm, having the good trafficability.
    The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
    All cylinders adopt hydraulic proportional control system to make them balanced.
    2.Comfortable cabin
    All-transparent cab, bright, quiet and operator can avoid tiredness.
    Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
    3.Easy operating system
    The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
    4.Advanced imported components
    The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

    5.convenient installation and transportation
    The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
    The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
    39m mast can be self-driven without cranes.

    6.sensitive safety operation management device
    The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
    Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry??
    and slurry for each passage. All these information can be printed according to pile numbers.

    主站蜘蛛池模板: 人妻碰碰碰| 国产在线精品一品二区| 亚洲成人av在线资源网| 国产激情免费视频在线观看| 亚洲AV无码专区色爱天堂| 午夜三级成人在线观看| 亚洲男女视频| 风间影音AV无码A片| 国产精品1024永久观看| 欧美大胆老熟妇乱子伦视频| 日日cao| 亚洲黄色网址| 曰韩免费无码AV一区二区| 中文字幕无码免费久久| 2019亚洲午夜无码天堂| 毛片av在线尤物一区二区| 久久美腿丝袜激情综合| 18成禁人视频免费| 欧美亚洲另类制服卡通动漫| 国产成人精品亚洲精品色欲| 无码网| 中文字幕乱码中文乱码毛片| 波多野结衣av无码| 人妻有码中文字幕| 天天撸狠狠操| 欧美老少配性行为| 国产精品自拍自在线播放| 国产不卡一区二区av| 国产在线拍偷自揄观看视频网站 | 强开少妇嫩苞又嫩又紧九色| 国产精品久久这里只有精品| 国产精品白浆一区二区免费看 | 欧美日本韩国亚洲| 国产全黄a一级毛片| 久久影院综合精品| 福利导航视频| 亚洲第一国产综合| 四虎国产精品永久在线国在线| 玖玖在线精品免费视频| 精品人妻一区二区三区蜜臀| 另类 专区 欧美 制服|